top of page

PROJECT 2
Construction drawings
(required task)

In this assignment, students work in groups and are tasked to choose a double story house/building in Malaysia. The building chosen could be focus more on either timber or concrete. Upon choosing the building, the group are required to come out drawings and model as follows:​

​

- Ground Floor Plan (1:50)

- First Floor Plan (1:50)

- Sections (1:50)

- Elevations (1:50)

- Floor to Roof Section (1:25)

- Door Details (1:10)

- Window Details (1:10)

- Staircase Details (1:10)

- Physical Model (1:10)

FINAL/EXPECTED OUTCOME

set of A3 orthographic drawings, detail drawings and models

Screenshot (3543)_edited.jpg

PROCESS

Process of researching, analyzing, planning and executing.

Image by Joanna Kosinska

REFLECTION

summarized project experience and achieved taylors graduate capabilities.

Image by José M. Reyes
bottom of page